成人免费无码大片A毛片,黑丝御姐被插,黄色网站,饥渴少妇a片aaa毛片小说,日韩av成人网在线观看

Conveyor switch

Bidirectional pull switch

The bidirectional pull switch is a bidirectional action, and pull ropes can be installed on both sides of the switch. When the belt conveyor equipment malfunctions, on-site workers pull the ropes on both sides of the bidirectional pull rope switch, causing the cam inside the switch to press the micro switch and put the switch into working mode, issuing a shutdown signal to prevent and control the equipment and personnel.

  • HFKLT2-II
  • ZHUOXIN
  • 24V-380V
  • IP67
  • TT, PayPal, Credit card, Western union
  • +86-15163766288
  • The bidirectional pull switch is widely used in various fields such as metallurgy, coal, cement building materials, mining, power, ports, metallurgy, chemical engineering, etc., including conventional belt conveyors, underground cable support belt conveyors, ship loading and unloading systems, stacking/reclaiming conveyors, inclined and shuttle conveyors, cranes, excavators, boom limiters, skirt feeders, and other types of conveyors.

Description

Conveyor switch







Bidirectional pull switch HFKLT2-II

The bidirectional pull wire switch HFKLT2-II is a protective switch that achieves emergency shutdown of the system in the event of an accident during the operation of a tape conveyor, protecting personnel or equipment< Br/>
1、 Overview
The bidirectional pull switch HFKLT2-II (i.e. pull rope switch, emergency stop switch) adopts an integral seal, which has the characteristics of waterproof, moisture-proof, dustproof, etc., and is suitable for use in harsh indoor and outdoor environments with high humidity and dust< Br/>




2、 Main use

This series of products is a protective switch for emergency shutdown of the system in case of accidents during the operation of tape conveyors, protecting personnel or equipment< Br/>
3、 Main technical indicators
Working voltage& Nbsp& Nbsp; AC220V

Action angle& Nbsp& Nbsp; 25< Br/>
Contact capacity& Nbsp& Nbsp; AC220V; 3A

Extreme angle& Nbsp& Nbsp; 75< Br/>
Contact form& Nbsp& Nbsp; Double breakpoint 1 normally open and 1 normally closed

Protection level& Nbsp& Nbsp; IP65

Service life& Nbsp& Nbsp; 100000 times

Re & Nbsp; Quantity& Nbsp& Nbsp; 2.5Kg





4、 External structure and working principle

1. Appearance structure

2. Working principle

This product is a bidirectional action, and pull ropes can be installed on both sides of the switch. When the belt conveyor equipment malfunctions, on-site workers pull the ropes on both sides of the bidirectional pull rope switch, causing the cam inside the switch to press the micro switch and put the switch into working mode, issuing a shutdown signal to prevent and control the equipment and personnel< Br/>




5、 Installation and wiring
(1)   Installation
Users can create a self-made installation bracket based on the installation dimensions indicated by the external structure, or they can order it from our company. Fix the switches on both sides of the tape machine, install them in pairs, and meet the following requirements:

1.  During installation, the product should be positioned below the tape (its height should be convenient for on-site personnel to use) and fixed on both sides of the tape conveyor along the line. The distance between each pull rope switch should be around 40 meters< Br/>
2.  Tie the pull rope to the swing arm of the switch body, fix it with a rope clip, and first install support rings on both sides of the switch nearby. Then install support rings every 3 meters to avoid excessive deflection and ensure the normal use of the switch< Br/>
3.  Under the premise of ensuring normal operation of the switch, try to tighten the ropes on both sides as much as possible and minimize the vertical deflection of the rope< Br/>
4.  For slope tape machines, the length of the pulling rope and the switching distance should be shortened as appropriate< Br/>
(1)   Wiring
Lead out a four core rubber sleeve cable at the outlet, which is red, blue, yellow, and black. Among them, red and blue are the outgoing lines of the dynamic break point. Yellow and black represent the outgoing lines of the dynamic closing contact. The wiring principle is shown in Figure (4)

6、 Maintenance and upkeep
1.  Regular dust removal, regular inspection of switch contact conversion status to ensure normal operation< Br/>
2.  If the machinery or steel wire rope is severely rusted, it should be replaced in a timely manner< Br/>


&Nbsp;

Tags

Get the latest price? We'll respond as soon as possible(within 12 hours)
骚逼痒痒了视频| 看韩国美女主播一区二区| 美女骚逼短视频| 精品亚洲成a人在线观看| 国产午夜精品无码理论片| 大鸡巴一插美女| 精品一区二区三区 电影网| 操一操影院在线午夜激情| 久久亚洲一区二区三区四区五区| 欧美一区三区日韩版夜黑| 日本加勒比一区在线观看| 我想看操大逼的| 欧美 亚洲 一区二区三区| aaaaaa毛片免费看| 国产精品18久久久久白浆| 成人电影在线播放| 中出熟女俱乐部| 99久久国产亚洲综合精品| 黄色网站女人操大黑逼片| 国产做a爱免费视频在线观看| 啊灬啊灬啊灬高潮了视频| 久久久久久国产电影av| 亚洲综合熟女久久久30p| 男人的天堂在成a免费视频| 国产日韩欧美无一区二区| 欧美操人操操操| 大肥波bbwwhbbww| 777琪琪午夜理论电影网| 大奶淫妇被调教视频露脸| 啪啪啪啪啪啪啪啪啪18禁| 中国熟妇xxxx| 精品国产污污在线18禁| 在线观看免费网页欧美成| 大黑吊操B毛片在线播放| 啊使劲操啊网站| 韩国妈妈的朋友| 3atv中文字幕在线不卡| 日本人爱一级一区二区三区| 亚洲精品无码影在线观看| 91免费一级特黄色片子| 狠狠躁夜夜躁人人爽天天|